CJ flooring limited

CJ flooring limited Contract & domestic flooring. Carpets, carpet tiles, vinyl, real wood, kardean, laminate and disabled shower rooms. SAMPLES AVAILABLE

Dockham Surgery in Cinderford.This job was 440sqm. Full preparation was done with cap and coving throughout all area’s, ...
27/04/2025

Dockham Surgery in Cinderford.

This job was 440sqm. Full preparation was done with cap and coving throughout all area’s, making it clinical and hygienic for hospital use.

Material fitted was Polysafe Wood FX colour Sun Bleached Oak.

Give us a call for any inquiries on 07532308276.

Winfield Hospital, Endoscopy Theater and Recovery suite.This job has been completed over the Easter weekend due to the t...
01/04/2024

Winfield Hospital, Endoscopy Theater and Recovery suite.

This job has been completed over the Easter weekend due to the theatre being closed.
Flooring used was Tarkett Optima colour grey white. For any inquires give us a call on 07532308276.

The Fritchie CentreAs seen in the pictures there were several area’s which had failed due to damp issues. To prevent thi...
07/10/2023

The Fritchie Centre

As seen in the pictures there were several area’s which had failed due to damp issues. To prevent this from happening again we’ve had to grind off the existing latex and take it back to the original subfloor. We used F77 damp proof membrane to stop any further rising damp. Material fitted was Tarkett Optima colour Light Green.

For any inquiries give us a call on 07532308276

Hazleton Ward at Cheltenham HospitalDue to the ward being run down and in need of renovating they taken the opportunity ...
23/09/2022

Hazleton Ward at Cheltenham Hospital

Due to the ward being run down and in need of renovating they taken the opportunity to redo the flooring. Material fitted was Tarkett tapiflex excellence 80. The whole area was coved and capped making it more hygienic and clinical. The total meterage for the job was 600 square meters

Churchdown School in Gloucester As seen in the photo’s the vinyl was failing and bubbling due to the original latex not ...
07/09/2022

Churchdown School in Gloucester

As seen in the photo’s the vinyl was failing and bubbling due to the original latex not being moisture tolerant. The original floor had to be ground down to insure there would be no further risk of failure as it wasn’t a moisture tolerant latex. The latex was removed and Ball F77 was applied to stop moisture travelling up and effecting the adhesive causing it to deteriorate. The material fitted was Altro vm20 colour Pavement

Winfield Hospital in Gloucester As the vinyl was worn and discoloured they opted to replace the original vinyl with Tark...
08/05/2022

Winfield Hospital in Gloucester

As the vinyl was worn and discoloured they opted to replace the original vinyl with Tarkett Optima colour light grey. Due to moisture in the subfloor we’ve had to put Tremco ES500 Sheet Membrane down first to prevent any moisture rising and effecting the new vinyl.

Bells Golf Club in Coleford Due to a total refurbishment they decided it was time to replace the worn and discoloured ca...
01/04/2022

Bells Golf Club in Coleford

Due to a total refurbishment they decided it was time to replace the worn and discoloured carpet. There was a lot of floor preparation on this job due to a lot of subfloor issues.
The material fitted was LG deco-tile 55 and the carpet was Cavalier Classic Herringbone.

For any inquires give us a call on 07532308276 or 07976 756977

Redwood house Gloucester hospitalDue to the carpet being very old and worn they decided to replace it with vinyl. This b...
25/06/2021

Redwood house Gloucester hospital

Due to the carpet being very old and worn they decided to replace it with vinyl. This brightened up the area to make it look more clinical.
The material fitted was Tarkett tapiflex which is a aquatic commercial vinyl. Full preparation was needed.

For any inquiry’s don’t hesitate to get in contact 07532308276 or 07976 756977

St Pauls Dental Surgery Cheltenham Due to the carpet being very worn and dated they’ve opted to make the area brighter a...
16/10/2020

St Pauls Dental Surgery Cheltenham

Due to the carpet being very worn and dated they’ve opted to make the area brighter and more clinical by using vinyl sheet. The material that was fitted was Tarkett Optima colour medium blue. Full preparation was required!

Beacon House Gloucester hospitalDue to damp in the newly poured concrete we’ve had to use a moisture vapour suppressant ...
11/07/2020

Beacon House Gloucester hospital

Due to damp in the newly poured concrete we’ve had to use a moisture vapour suppressant DPM. So it was fully prepared with a dpm and latex. Material fitted was tarkett optima colour medium blue.

Rikenel Health Centre Gloucester Due to the existing carpet looking very dated and worn, they’ve opted to brighten up th...
07/07/2020

Rikenel Health Centre Gloucester

Due to the existing carpet looking very dated and worn, they’ve opted to brighten up the area with blue carpet tiles. Carpet tiles that was fitted was burbury. For any inquiries give us a call on 07532308276 or 07976 756977

Ribston Hall High School Gloucester Due to the Terrazzo looking worn and dated Ribston School wanted to modernise the ar...
12/06/2020

Ribston Hall High School Gloucester

Due to the Terrazzo looking worn and dated Ribston School wanted to modernise the area, make it brighter and more welcoming.
The whole area was latexed before fitting Polysafe Wood FX. Give us call for any inquiries on 07532308276 or 07976756977

Address

2 Stephens Place
Frome
GL167BJ

Website

Alerts

Be the first to know and let us send you an email when CJ flooring limited posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Practice

Send a message to CJ flooring limited:

Share

Share on Facebook Share on Twitter Share on LinkedIn
Share on Pinterest Share on Reddit Share via Email
Share on WhatsApp Share on Instagram Share on Telegram