WS Diekedie LTD

WS Diekedie LTD Achitecture | Construction | Landscape design
📧 wsdiekedie@gmail.com
📞 +2348101046211

After completing the DPC, the next stage is the forming of the first course. At this point, we carefully set out and ali...
26/11/2025

After completing the DPC, the next stage is the forming of the first course. At this point, we carefully set out and align the blocks to establish clean door and window openings, keeping the entire layout straight and accurate.

Once the first course is properly formed, additional courses are gradually added, ensuring correct bonding, level, and plumb as the walls begin to rise smoothly above the DPC.

#

The architect stands as a creator. Shaping emptiness into purpose, giving form to vision, and calling structure out of c...
10/11/2025

The architect stands as a creator.

Shaping emptiness into purpose, giving form to vision, and calling structure out of chaos.

Like God in the beginning, the architect speaks through lines and plans, commanding space to take meaning.

Every design becomes a reflection of divine order — where imagination meets creation and the unseen becomes seen.

©Diekedie S Woyengifie.🖌️

In this project, we adopted a hybrid foundation system to address the site’s ground condition and structural requirement...
05/11/2025

In this project, we adopted a hybrid foundation system to address the site’s ground condition and structural requirements.

The system combines pad foundations, a raft base, and floating beams, all introduced strategically before sandfilling.

We began by setting out and excavating individual column points to the required depth. Pad foundations were then introduced at each column location — these serve as isolated footings designed to carry and distribute the heavy point loads from the columns to the soil below. Each pad was reinforced and cast to the specified thickness and dimensions.

Next, we introduced a raft base beneath the beams to create a continuous and stable platform that ties all the pads together. This raft layer serves to unify load distribution and prevent differential settlement, especially important in the waterlogged or soft-soil sections of the site.

Above the raft, floating beams were positioned and reinforced to act as the structural tie (chaining) around the building. These beams provide lateral stability and serve as a framework to support the subsequent sandfilling operation without excessive material loss.

Only after the floating beams and raft had fully cured was sandfilling operation began and will be carried out up to the required level, followed by proper compaction to ensure a solid base for the German floor and superstructure.

© Diekedie Samuel Woyengifie

Sight Works🔥
01/11/2025

Sight Works🔥

✨Current..
01/11/2025

✨Current..

31/10/2025

THANKYOU
FOR YOU.

Jesus.

31/10/2025

There's a God Leading,
There is a Me following

It takes me to COMMITthen God COMMITS.
31/10/2025

It takes me to COMMIT
then God COMMITS.

WS DIEKEDIE LTD successfully conquered the challenge of constructing a 5-bedroom duplex in the difficult, waterlogged te...
30/10/2025

WS DIEKEDIE LTD successfully conquered the challenge of constructing a 5-bedroom duplex in the difficult, waterlogged terrain of Bayelsa State.

Despite the unstable soil and high water table, the company applied expert engineering solutions—using a well-designed raft/pad foundation system and effective site drainage—to ensure long-term structural stability.

Through meticulous planning, technical precision, and hands-on supervision.

This project stands as a testament to the company’s innovation, resilience, and commitment to quality construction in tough terrains.

Corporate ResponsibilityWe believe in building beyond structures. Our commitment extends to community development, envir...
27/10/2025

Corporate Responsibility

We believe in building beyond structures. Our commitment extends to community development, environmental sustainability, and capacity building, ensuring that our projects contribute positively to society and future generations.

---

Contact Us

WS DIEKEDIE LTD
Transparency Plaza, Oxbow Lake, Swali Road
Yenagoa, Bayelsa State, Nigeria

📞 Tel: 08101046211
📧 Email: wsdiekedie@gmail.com

Address

London

Website

Alerts

Be the first to know and let us send you an email when WS Diekedie LTD posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Share on Facebook Share on Twitter Share on LinkedIn
Share on Pinterest Share on Reddit Share via Email
Share on WhatsApp Share on Instagram Share on Telegram