Doors installed throughout most of the house today. Few more to do then trim them out and install baseboards.
03/27/2026

Doors installed throughout most of the house today. Few more to do then trim them out and install baseboards.

Cabinets installed now for the counter tops.
03/25/2026

Cabinets installed now for the counter tops.

I would like all those who are following the progress on this home we're building for the Hauque family to please check ...
03/19/2026

I would like all those who are following the progress on this home we're building for the Hauque family to please check in and comment on what they think of what's been accomplished so far. All comments will be appreciated even if some are negative. I annalise all criticism and use what I learn from them and apply that to future design projects. This is the first home of this type I've ever designed so all your thoughts will be most helpful to me in the future. Thank you if you choose to critique.

First floor tile completed, cabinets installed in both kitchens, doors , drawers ,side panels,shelves and island will be...
03/19/2026

First floor tile completed, cabinets installed in both kitchens, doors , drawers
,side panels,shelves and island will be finished tomorrow, tiling done in upstairs baths and master bathroom. Hopefully next week doors , bathroom cabinets, baseboards, appliances, stairs and electrical finish will be started on. The workmanship is looking very good, slow but it's getting done right and in the end that's what counts.

Tile guys moving along. Cabinets delivered waiting on the installers to show up. Once the bathrooms and cabinets are don...
03/10/2026

Tile guys moving along. Cabinets delivered waiting on the installers to show up. Once the bathrooms and cabinets are done I'll be finished with my end of this job. The rest will be left to the electrician, plumber , finish carpenter and landscaper. That part is all on the owner.

Mike is doing a great job. Him and his helper are excellent workers. The crown molding is finished ready to caulk and pa...
03/05/2026

Mike is doing a great job. Him and his helper are excellent workers. The crown molding is finished ready to caulk and paint.

More trim and tiling done. Coming along.
03/01/2026

More trim and tiling done. Coming along.

Lot more floor tiling done. Paper laid to protect it . Crown molding and Showers started .
02/25/2026

Lot more floor tiling done. Paper laid to protect it . Crown molding and Showers started .

Stone man has a little left to do. Floor cracks fixed and tile started after concrete sealer applied. Finish trim starte...
02/18/2026

Stone man has a little left to do. Floor cracks fixed and tile started after concrete sealer applied. Finish trim started. Hopefully kitchen cabinets will be installed next week.

AC units installed all vents and filters installed. That's a done deal. Stone man still at it. Got to give him credit, h...
02/06/2026

AC units installed all vents and filters installed. That's a done deal. Stone man still at it. Got to give him credit, he's the only one working today. To cold for inside guys I guess.

Stone work started today. Aqua seal done on all shower stalls. 480 ft of cracks in the slab grooved out and sealer start...
02/04/2026

Stone work started today. Aqua seal done on all shower stalls. 480 ft of cracks in the slab grooved out and sealer started. Grates started on ceilings today. Finally making some progress again. I've built many houses, an elementary school, three shopping plazas , a McDonald's, a 7/11 , a Store 24 ,many historical restoration projects and countless remodeling projects and never in the 54 years that I've been in business have I ever been as frustrated as this house as caused me to be. I wish I had just stayed retired. I have got to learn to listen to my wife.

Pad poured for AC units today. Also all the floor cracks are being groved out and repaired getting ready for tile.
02/03/2026

Pad poured for AC units today. Also all the floor cracks are being groved out and repaired getting ready for tile.

Address

2233 Burnway Road
Haines City, FL
33844

Website

Alerts

Be the first to know and let us send you an email when EnviroConcepts By Jerrold aka The Jerry Gonsalves Show posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Practice

Send a message to EnviroConcepts By Jerrold aka The Jerry Gonsalves Show:

Share

Share on Facebook Share on Twitter Share on LinkedIn
Share on Pinterest Share on Reddit Share via Email
Share on WhatsApp Share on Instagram Share on Telegram