EnviroConcepts By Jerrold aka The Jerry Gonsalves Show

EnviroConcepts By Jerrold aka The Jerry Gonsalves Show to share what we do and offer advice on building and remodeling projects

Moving along.
07/23/2025

Moving along.

Plumbers , electricians and framers rapping up details getting ready for inspections.
07/22/2025

Plumbers , electricians and framers rapping up details getting ready for inspections.

Second floor windows are in, next the doors then stucco and roof.
07/18/2025

Second floor windows are in, next the doors then stucco and roof.

First floor windows are in and two Air handlers. Second floor windows tomorrow.
07/16/2025

First floor windows are in and two Air handlers. Second floor windows tomorrow.

Insulation, drywall and taping done in the air handler closet ready for copper tubing and electrical wires.Just need to ...
07/01/2025

Insulation, drywall and taping done in the air handler closet ready for copper tubing and electrical wires.Just need to paint it . Then the drywall contractor can finish it up after the handler is installed.

Ductwork, wiring and plumbing just about finished.
06/28/2025

Ductwork, wiring and plumbing just about finished.

Wiring started. The mechanicals should be done next week. Windows week after the insulation installed. Stucco and roof s...
06/26/2025

Wiring started. The mechanicals should be done next week. Windows week after the insulation installed. Stucco and roof shortly after. I really got this project moving now.

Started outside trim.
06/20/2025

Started outside trim.

Duct work finished on the first floor. Second floor duct work should be done over the weekend.
06/12/2025

Duct work finished on the first floor. Second floor duct work should be done over the weekend.

AC Ducts started today .
06/07/2025

AC Ducts started today .

Rough in plumbing started, AC materials on the job and interior doors ordered today.
06/05/2025

Rough in plumbing started, AC materials on the job and interior doors ordered today.

Pocket doors and staircase and bathroom walls done today.
06/04/2025

Pocket doors and staircase and bathroom walls done today.

Address

2233 Burnway Road
Haines City, FL
33844

Website

Alerts

Be the first to know and let us send you an email when EnviroConcepts By Jerrold aka The Jerry Gonsalves Show posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Practice

Send a message to EnviroConcepts By Jerrold aka The Jerry Gonsalves Show:

Share

Share on Facebook Share on Twitter Share on LinkedIn
Share on Pinterest Share on Reddit Share via Email
Share on WhatsApp Share on Instagram Share on Telegram