11/18/2025
When Dr. Rosado isn't at the hospital, she's still working hard to make sure all animals are taken care of! We present to you: The Mather Castle of the Pigs. Erected 11.10.2025. The design is original with the finished product made of cinderblock, wood, metal sheeting, and a beautiful blue finish complete with signage. It features a pitched roof to defer water to behind the home and an elevated foundation to protect the (not water-proof) plywood from ground moisture. The project took approximately 3 hours to complete and is expected to last approximately 90 days. 🐾💕🐖