Technomax Engineering

Technomax Engineering Environmental Friendly Engineering

We are pleased to inform you that we have successfully completed a project titled “Fuel Tank Supply and Installation. Th...
30/08/2025

We are pleased to inform you that we have successfully completed a project titled “Fuel Tank Supply and Installation. The project included the fabrication and installation of an 800-liter cylinder-type fuel storage tank, manufactured from non-magnetic 304 stainless steel (matte finish, 3mm thickness SS sheet).

For further information or inquiries, please feel free to contact us at 01716-250073.

PI duct work and Fire pump installation
29/08/2025

PI duct work and Fire pump installation

28/08/2025
Technomax- Environmental Friendly Engineering able to provide you 100% authentic MWM Gas Generator Spare parts with serv...
27/08/2025

Technomax- Environmental Friendly Engineering able to provide you 100% authentic MWM Gas Generator Spare parts with services.
Hope, you all will look after our website or if you want, visit our office.

“PPE – Essential, Not Optional“
23/08/2025

“PPE – Essential, Not Optional“

We are pleased to inform you that our inventory includes a comprehensive range of MWM gas generator spare parts.Orders c...
20/08/2025

We are pleased to inform you that our inventory includes a comprehensive range of MWM gas generator spare parts.
Orders can be placed at your convenience through both online and offline channels.
For any further assistance or inquiries, please feel free to visit our office or contact us by phone. We will be happy to assist you.

It's a proud milestone for Technomax Engineering. We are thrilled to announce the successful completion of one of the bi...
19/08/2025

It's a proud milestone for Technomax Engineering. We are thrilled to announce the successful completion of one of the biggest and prestigious projects in Technomax Engineering history — a Co-Generation System featuring:
🔹 2 × 4.3MW + 1 × 1.8MW MWM Gas Generators
🔹 7 TPH Exhaust Gas Boiler (EGB)
This project was executed for one of the leading chemical factories in Bangladesh and stands as a testament to our engineering excellence, dedication and teamwork. Thank you to all our team members, partners, and stakeholders whose relentless support and commitment made this achievement possible.

শুভ জন্মাষ্টমী
16/08/2025

শুভ জন্মাষ্টমী

13/08/2025

Address

Uttarati

Alerts

Be the first to know and let us send you an email when Technomax Engineering posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Practice

Send a message to Technomax Engineering:

Share

Share on Facebook Share on Twitter Share on LinkedIn
Share on Pinterest Share on Reddit Share via Email
Share on WhatsApp Share on Instagram Share on Telegram