06/01/2025
Be mindful about routes being taken to arrive for Monday appointments, and possibly Tuesday as well:)
UPDATE ROAD IS FIXED AND NOW OPEN
The repair of the watermain on Pinebush at Hespeler was completed and placed back into service late last night.
Due to the size of the damage a portion of the road’s asphalt was lifted, and the excavation needed was significant.
As a result, there is quite an extensive restoration needed, requiring the westbound lane of Pinebush road, east of Hespeler Rd, to remain closed until at least end of day Monday. This is the area between Home Depot and the gas station.
Please avoid the area if possible and be patient as every navigates detours.