05/28/2026
The team is now packing up their tools from another successful SLD AirFRAME modular ceiling install! Abbotsford Regional Hospital and Cancer Centre reached out with a real dilemma; a tight opening deadline which wasn’t possible to hit using traditional construction methods. Just the challenge we love!
Successfully delivered the project on time with no schedule delays, change orders, or cost over-runs by utilizing our modular solution. Oh, and by the way? It was moved in overnight and installed in 3 days with just a handful of installers, rather than dozens of different contractors traipsing through an active hospital each day for several months! 💪
It doesn’t, but we think SLD should stand for Such Little Disruption 😉
Learn more:
OUR WORKAbbotsford Regional Hospital and Cancer Centre SLD Technology AirFrame“The SLD AirFrame system was implemented as part of the ARH Interventional Radiology suite, contributing to a clean, modern, and highly professional clinical environment. The installation integrated smoothly into the pro...