
17/10/2024
The rising demand for data centers with IT loads over 1,000kW is increasing arc flash risks. Larger facilities now receive fault currents exceeding 50kA, compared to about half that in smaller 500kW centers. This growth in power capacity is driving higher fault current levels, elevating the risk of arc flash incidents. https://bit.ly/3TR1QoF