01/09/2025
Back to school for most this week, but it’s ’end of school’ for us.
We’ve installed a large Paxton Net2 Access Control & Intercom system over in Barnehurst this summer, comprising of 7 callstations & 4x handsets on the intercom side, along with taking over the existing Net2 & replacing all the old Switch2 for Net2, bringing the school solely onto the Net2 Pro software, now 18 doors in total. We’ve also programmed all staff cards ready for the staff to return and collect.
A lot of work gone into this, bringing together multiple trades over the weeks.
- 300 metres of duct work buried and groundworks reinstated.
- New armoured cables run in for POE switch points & enclosures externally.
- Existing vehicle & pedestrian gates fully serviced.
- Existing pedestrian gate cut & welded to swing correctly.