03/06/2025
From dream to reality!
Dive into the details of our kick-off meeting with the Hong Kong Football Club hot & cold plunge project!
After over six months of meetings and preparations, KS Aqua Group has held the final kick-off meeting with the Hong Kong Football Club ‘s management as the project manager for the supply and installation of two sets of hot and cold plunge pools on the 2nd floor of the swimming pool. Due to the long history of the club and the site condition, KS Aqua Group provides professional advice on pumps and filtration systems to provide the supply & installation service named “Turn-key Service ”(交鑰匙) , “香港足球會按摩浴缸(冷缸&熱缸)全案交付施工” . KS Aqua Group had a productive walkthrough with the management team to finalize outstanding details and add those final touches. While the process has been challenging, it has also been incredibly rewarding. Working with a client who values design, great spaces, and meticulous detailing makes all the difference.
Our collaboration with Hydroworx, the chiller and plunge manufacturer in the USA, is a testament to their global leadership in aquatic therapy pools, serving notable clients such as Chelsea, the NBA, NASA, and the Rugby Club. In turn, clinicians and sports medicine professionals utilize their products to elevate physical rehabilitation, wellness, and athletic performance to unprecedented levels of efficiency and intensity. It is trusted by physical therapists and elite athletic programs worldwide because its technology has been affirmed by published research.
HKFC was founded in 1886, boasting the longest history of decades in Hong Kong for a members-only service, with a mission to facilitate the development of sporting activities in the City. HKFC is taking two sports, Rugby and Soccer, and with the dedication and enthusiasm of its members.
It’s exciting to finally kick off the project and make our dream a reality!