RPV Electrotech Power Systems, Inc.

RPV Electrotech Power Systems, Inc. RPV Electrotech Power System, Inc. specialiazed in Power Quality Solutions, Energy Efficiency and Power System Equipment & Metering & Protection..

09/07/2022
08/02/2022

On-going Rehabilitation of 400kVAR and 650kVAR Capacitor Bank @ Laguna Project Site. Flex ko mga hardworking personnel natin to complete the job soon.

Unboxing our new 4000A, 3pole ATS from South Korea for a Hospital project in Baguio City.
18/11/2021

Unboxing our new 4000A, 3pole ATS from South Korea for a Hospital project in Baguio City.



25/05/2021

Installation of two (2) units Enertronikz ProSPD in LVSG with 100kA Surge Capacity per phase and with Surge Counter.

Shout out to Team RPV Julz, Marlon, Andy & Lorenz.



24/05/2021

Installation of Enertronikz ProSPD "Surge Protective Device" with Surge Capacity of 100kA per phase w/ Surge Counter. These two (2) units were installed in the Elevator Panel. Two (2) out Ten (10) SPD's installed for this project in Quezon City.

For your SPD requirement call us @ 02-7748-1984
0917-1166291 - Globe
0922-6398290 - Sun
or email us @
rpvelectro@gmail.com
rpvelectrotech@gmail.com



21/05/2021

4th day work on the er****on of First Private Pole (FPP) and support poles in International Port of Batangas.

1st day of mobilization for the installation of Power Distribution Line and First Private Pole in Batangas Port Project....
17/05/2021

1st day of mobilization for the installation of Power Distribution Line and First Private Pole in Batangas Port Project.

#051721

Supply of Bakiral Lightning Arrester, Lightning Counter & 6 meter Lightning Pole/Mast.
22/04/2021

Supply of Bakiral Lightning Arrester, Lightning Counter & 6 meter Lightning Pole/Mast.

Power Audit Services in a Broiler House in Bulacan.
16/04/2021

Power Audit Services in a Broiler House in Bulacan.

Final inspection and turn-over of ESE Lightning Arrester Project in an Industrial Facility in San Pablo, Laguna.
07/02/2021

Final inspection and turn-over of ESE Lightning Arrester Project in an Industrial Facility in San Pablo, Laguna.




Arrival of 300pcs. C2000 Single Phase Smart Energy Meter (RPV MicroStar) 260pcs of which are 5(60)A for delivery to cust...
07/02/2021

Arrival of 300pcs. C2000 Single Phase Smart Energy Meter (RPV MicroStar) 260pcs of which are 5(60)A for delivery to customer while 40pcs. 5(100)A for stock.


Last month of January we supply our first set of Multi-circuit AcuRev2020 from Accuenergy with 18 Channels which is capa...
05/02/2021

Last month of January we supply our first set of Multi-circuit AcuRev2020 from Accuenergy with 18 Channels which is capable to measure 18 Single Phase Loads or 6 Three Phase Loads with Multi-function parameters, Data Logging ang PQ functionality. Accessories includes 18pcs. of AcuFlex Current Transducers that can reads up to 6000A. Thank you to our valued customer.


Throwback Project three (3) years ago: Energization of Enertronikz Static Voltage Stabilizer (SVS)(Made in Turkey) 75kVA...
02/02/2021

Throwback Project three (3) years ago:

Energization of Enertronikz Static Voltage Stabilizer (SVS)(Made in Turkey) 75kVA, 400V, 3phase, 60Hz @ Mayflower BPO Building located in Mayflower (near EDSA Central), Mandaluyong City.
Initial Testing method conducted:
1.) Energize SVS and measured Input and Output Voltage on By-Pass Mode and Regulator Mode.
2.) Energize GE UPS (Supply by other vendor) (without load and battery connected) on the load side of SVS while it is in Bypass Mode.


Throwback Project last 2020 in Bulacan for the Supply, Installation, Testing & Commissioning of 1.5 MVA, 34.5kV - 460V, ...
31/01/2021

Throwback Project last 2020 in Bulacan for the Supply, Installation, Testing & Commissioning of 1.5 MVA, 34.5kV - 460V, Dyn11 Substation Transformer (Enertranz) including First Private Pole. Hoping to get similar project early this year.

On-going installation of Bakiral E.S.E. Lightning Arrester in MSU-IIT Iligan City. Thank you to our valued customer and ...
19/01/2021

On-going installation of Bakiral E.S.E. Lightning Arrester in MSU-IIT Iligan City. Thank you to our valued customer and partner in Iligan City.

Another completed job for the Supply & Installation of Bakiral E.S.E. Lighting Arrester in San Pablo, Laguna. Thank you ...
19/01/2021

Another completed job for the Supply & Installation of Bakiral E.S.E. Lighting Arrester in San Pablo, Laguna. Thank you to our valued customer.

Address

#3 1st Street Riverside Village, Ortigas Extn., Sta. Lucia, Pasig City
Pasig
1608

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5am
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

+6377481984

Alerts

Be the first to know and let us send you an email when RPV Electrotech Power Systems, Inc. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Practice

Send a message to RPV Electrotech Power Systems, Inc.:

Share