Bouma Corporation

Bouma Corporation 🧱 Commercial Interior + Exterior Finishes
🔨 Building Since 1950
🏅 Committed to Quality
🦺 People-Focused
📍 Serving Michigan

PRECONSTRUCTION AND PROCUREMENT
Estimating and Budgeting Services
National Material Procurement
Local Warehousing
Direct Buyer – USG Ceilings
Direct Buyer – ClarkDietrich Metal Framing

BUILDING STRUCTURE/ENVELOPE
Panelized and Conventional Built Structural Cold-Formed Metal Framing
Exterior Sheathing
Air and Water Barrier Systems
Continuous Insulation Systems
EIFS Exterior Finish Systems
Exterior Cladding Systems
Structural Insulated Building Panel Systems
Spray Applied Fireproofing

INTERIOR FINISHES
Solid Surface and Laminate
Wall Protection Systems
Clean Room Construction Systems
Historical Plaster Renovation
Fellert Acoustical Plaster Certified
Bathroom and Movable Partitions
Interior Metal Framing
Drywall and Finishing
Wall Insulations
Plaster and Moldings
GRG/GRC Plaster Fabrications
Acoustical Ceilings
Metal and Wood Specialty Ceilings
Acoustical Wall Panels
Hard Tile and Stone
Sheet Vinyl Flooring
VCT and Luxury Vinyl Tiles
Epoxy and Terrazzo Floors
Resinous Floors
Broadloom and Modular Carpet
Wood Flooring
Fire Stopping
Rough and Finish Carpentry
Millwork
Doors, Frames, and Hardware
General Trades

FLOOR LAYOUT SERVICES
The Dusty Floor Printer is the next generation of construction layout, helping to dramatically reduce schedule time and rework costs through an accurate, full-scale floor layout.

10/29/2025

Excellence and craftsmanship are what we strive for on every job, every day. One of our core values is Performance Excellence-- reaching for a constantly higher standard of quality and productivity is at the heart of what we do.

We are proud of our team that embodies this value in their day-to-day work. Keep it up, guys!

Progress is moving steadily at Corewell Health’s new Endoscopy Facility — framing is enclosed, drywall is going up, and ...
10/22/2025

Progress is moving steadily at Corewell Health’s new Endoscopy Facility — framing is enclosed, drywall is going up, and ceilings are taking shape. Great work, team!

10/16/2025

We had our last summer jobsite grillout today at Gentex– now that it's not really summer anymore.🍂🍁

Some members of the office crew came out to feed the team working on site, showing them how much we appreciate their hard work. Keep it up, guys!

An insider's look at the Acrisure Amphitheater: ceiling grids, bulkheads, and some final finishes in progress – keep up ...
10/10/2025

An insider's look at the Acrisure Amphitheater: ceiling grids, bulkheads, and some final finishes in progress – keep up the good work, team!

We continue to be grateful for the opportunity to partner with Pioneer Construction and Barton Malow on this project.

10/08/2025

This is your inspiration to do a jobsite safety walk!🚧

Safety is one of our core values and an integral part of our culture. We believe safety should never be compromised. It is a shared responsibility that we all take seriously.

After we built ceiling clouds on the gym floor next door, we're finally installing them in Covenant Christian High Schoo...
10/03/2025

After we built ceiling clouds on the gym floor next door, we're finally installing them in Covenant Christian High School's new auditorium.

Thank you to GDK Construction Co. for leading the way on this project– we're proud to play a role in it!

10/01/2025

Using tools like Dusty Robotics, we’re bringing more precision and speed to the field — handling multi-trade layouts in a fraction of the time it used to take.

What once took days can now be done in hours, with accuracy that keeps schedules on track and cuts down on rework.

It’s a proud moment for our team — two of our projects have earned 2025 Excellence in Construction Awards from Associate...
09/26/2025

It’s a proud moment for our team — two of our projects have earned 2025 Excellence in Construction Awards from Associated Builders and Contractors, Western Michigan Chapter, celebrating the craftsmanship and care that go into everything we build.

🏆 Interior Finishing Less than $1 Million — Amway Grand Hotel Atrium Renovation

🏆 Interior Finishing More than $5 Million — Kalamazoo Regional Educational Service Agency Career Connect Campus

Every project is a team effort — from the field to the office, and we're grateful for each person who gave their time and energy to these projects. We’re grateful for the trust our partners place in us and proud of the people who make this work possible every day!

Precision at its finest. After our Dusty Robotics layout robot marked the way, our crews installed a concrete raised acc...
09/24/2025

Precision at its finest. After our Dusty Robotics layout robot marked the way, our crews installed a concrete raised access floor as part of the remodel of a new online gaming hub.
Through our partnership with Global Integrated Flooring Solutions, we deliver raised flooring systems that keep electrical, data, and more running cleanly out of sight.

We’re excited to celebrate the completion of Gentex Corporation's new Discovery Preschool with ODC Early Childhood Netwo...
09/18/2025

We’re excited to celebrate the completion of Gentex Corporation's new Discovery Preschool with ODC Early Childhood Network. It was a privilege to partner with Lakewood Construction on this 43,000-square-foot facility.

Our crew did an amazing job on the drywall, flooring, casework and countertops, and the doors, frames, and hardware package. We’re proud of the craftsmanship our people put in and the finished space that stands because of their hard work.

Our team out at the Gerald R. Ford International Airport deserves a shoutout! They are well underway installing the meta...
09/12/2025

Our team out at the Gerald R. Ford International Airport deserves a shoutout! They are well underway installing the metal framing and drywall that forms the backbone of the Terminal Enhancement Project. This project will expand and modernize the terminal—streamlining baggage handling, improving passenger flow, and enhancing the overall guest experience for a growing airport. Keep up the good work, guys!

Address

4101 Roger B Chaffee Boulevard SE
Grand Rapids, MI
49548

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Alerts

Be the first to know and let us send you an email when Bouma Corporation posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Share on Facebook Share on Twitter Share on LinkedIn
Share on Pinterest Share on Reddit Share via Email
Share on WhatsApp Share on Instagram Share on Telegram