10/13/2025
https://oshkoshguitar.com/road-construction/
The city of Oshkosh is adding waterlines for new buildings coming across the street from my music studio. Lessons will continue through the construction. To get to the music studio, drive down Washington Avenue from Bowen. Turn right onto Rosalia. Take the very first right (Winnebago Ave). There wil...