03/10/2026
Phase 2 of the Toray Composite Materials America carbon fiber manufacturing expansion in Spartanburg, SC, added 300,000 square feet of new production space to support growing aerospace demand across North America.
Clayco and LJC delivered the project alongside an active chemical facility, requiring careful coordination at every stage. The work included more than 500 ground improvement piers, specialized wastewater systems, an 8-foot-thick mat slab, and 3,800 tons of structural steel, all completed without disrupting ongoing operations.
With safety at the forefront, close collaboration between Clayco, LJC and the ownership group ensured the facility and manufacturing systems functioned seamlessly while meeting key milestones.
For more on this project, visit: https://ow.ly/TGMH50YrRHj