A two part pour concrete footing is in. Will wait at least five days before we remove the wall. And will start getting ready for the second part of the concrete, which is the floor. The floor blueprint call out for 2 inches of sand and add 15 mil plastic than another 2 inches of sand so a total of 4 inches of sand with number four rebar 16” on center throughout the floor before the concrete is poured.