02/01/2026
Primer is done. The paint and flooring will be started next weekend. I started to get upset with my husband i need to work and i felt as though he was dragging his feet but i had to remember i can’t help him anymore than i have and he’s doing the best he can from working all week and then downstairs. it’s a lot for him. I can see the light at the end of the tunnel. i can honestly say i should be setting up shelves and cabinets in 2 weeks. I will say he did an excellent job on the sheetrock and mud!
i’m only showing small areas i want to save the reveal for when it’s finished