๐ก๐ A passed FAT is an important milestone โ but it is not always proof of full site readiness.
In real projects, some of the biggest risks only show up later:
1๏ธโฃ when interfaces are connected but never fully verified
2๏ธโฃ control logic behaves differently on site
3๏ธโฃ transfer and failover are not tested under real load
4๏ธโฃ pass criteria are interpreted differently
5๏ธโฃ handover documents are still incomplete
In our latest blog, we break down five commissioning gaps that still cause downtime โ and why they persist even in well-managed critical power projects.